Application for the Proposed Development of a Gas Peaking Plant on Land to the North of National Grid’s 275/400KV Legacy Substation, Talwrn, Wrexham LL14 4HY

** CONSULTATION NOW CLOSED **

AXIS has been commissioned by HG638LEG Limited to prepare and submit a planning application for a gas peaking plant on land to the north of the existing National Grid Legacy Substation. The plant will generate up to 49.5MW and therefore constitutes a Development of National Significance (DNS) in Wales under the Developments of National Significance (Wales) Regulations 2016 (as amended). In accordance with Section 62 of the Town and Country Planning Act 1990, the application will be made to the Welsh Ministers.

Fuller details regarding the details of the application are provided within the introductory section of the Planning Statement in the application documentation below.

In accordance with the requirements of relevant DNS Regulations, a six week pre-application public consultation is required, which is the stage the application is at currently. Therefore, this webpage has been produced in order to ensure that interested parties can access the full suite of planning application documentation and make representations should they wish. There will also be a chance to make comments during the applications submission consultation period.

Anyone who wishes to make representations must do so by 6:00pm on 18th October 2020.

Representations can be made by emailing comments to consultations@axisped.co.uk. Hard copies of the draft application documents can also be provided on request using the telephone number 0844 8700 007. This number can also be used if interested persons wish to discuss the application.

These means will enable your comments to be considered, as part of the pre-application consultation process.