Projects

AXIS provides planning, environmental, design and transportation services on a broad spectrum of major development projects across the UK due to the range of services and sectors that we work in and the wealth of experience that our staff can offer.

Slade Lane Mixed-Use Development

AXIS led a comprehensive team of consultants in the preparation and submission of an Outline application for 729 residential properties and a 100,000sq.ft Sainsbury’s superstore, on the outskirts of Haverfordwest. A detailed planning application was also submitted simultaneously for the retail unit, together with all…

Posted in Projects | Comments Off on Slade Lane Mixed-Use Development

Tower Wharf, Chester

AXIS are working with Miller Developments on a new 408 bed student residence development at the Tower Wharf site in Chester. The development would be delivered across three new student residence buildings and would effectively complete the regeneration of this important edge of city centre…

Posted in Projects | Comments Off on Tower Wharf, Chester

South Clyde Energy Centre (SCEC)

AXIS advised Peel Environmental on its proposal to develop an integrated waste recycling and recovery facility on land off Bogmoor Road in North Cardonald, Glasgow. The principal processes to be carried out at the plant comprise the receipt, storage and processing of non-hazardous waste, including…

Posted in Projects | Comments Off on South Clyde Energy Centre (SCEC)

Javelin Park Energy from Waste Facility

AXIS supported Urbaser Balfour Beatty (UBB) in the planning and design of their solution for the Gloucestershire County Council’s residual waste contract. UBB were awarded the contract by the Council in 2012 and are proposing to build an Energy from Waste plant that would manage…

Posted in Projects | Comments Off on Javelin Park Energy from Waste Facility

Meir Primary Care Centre

AXIS prepared a detailed Transport Assessment and Travel Plan to support the development of a new £11m Primary Care Centre development serving the Meir area of Stoke-on-Trent. The facility brings together six existing local GP surgeries onto one site, along with other supporting primary care…

Posted in Projects | Comments Off on Meir Primary Care Centre

Nestle Water Bottling Plant

As lead landscape architects AXIS helped Nestlé secure planning permission for a new bottling plant for its Buxton Natural Mineral Water. The 17 acre greenfield site to the North East of Buxton was officially opened in march 2013 by Nestlé S.A. CEO, Paul Bulcke and…

Posted in Projects | Comments Off on Nestle Water Bottling Plant

Global Research HQ

Alderley Park is AstraZeneca’s largest research site, located amongst over 160 hectares of woodland and historic parkland in Cheshire. AXIS was commissioned to prepare a landscape strategy to guide a major investment programme and has subsequently undertaken several hard and soft landscape design commissions to…

Posted in Projects | Comments Off on Global Research HQ

Holyhead Waterfront

AXIS secured planning permission for a comprehensive mixed-use development on 1.2km of Holyhead’s waterfront at Newry Beach and Porthyfelin. Comprising of a 500 berth commercial marina, 353 residential units, an 80 bedroom hotel, circa 40,000sq.ft of commercial/retail floor space and other ancillary development, the project…

Posted in Projects | Comments Off on Holyhead Waterfront

Airbus A380 Wing Factory and River Dee Load-out Facility

AXIS secured detailed planning permission for two variant designs of the A380 Wing Factory at Broughton, together with the River Dee Load-Out Facility and managed the post-determination planning process on behalf of Airbus and their construction Partner Laing O’Rourke. At circa 900,000sq.ft in floor area,…

Posted in Projects | Comments Off on Airbus A380 Wing Factory and River Dee Load-out Facility

Back Lane Quarry Wind Turbine

A Single 500kW wind turbine to supply renewable energy to Back Lane Quarry.  AXIS project managed the initial planning and environmental feasibility appraisal and then prepared the planning application and supporting documentation.  AXIS also undertook the LVIA on this particularly sensitive site and worked with…

Posted in Projects | Comments Off on Back Lane Quarry Wind Turbine